Industrial Projects
|
- Central Forge and Foundry Project, Hardwar/ Bhel
- Cement Plant for CCI, at Paonta Sahib & Tandur
- Bharat Pumps and Compressors Ltd. Factory/Naini
- Transformer Factory, Jhansi/ Bhel
- Hindustan Cables Ltd. Factory /Hyderabad
- Mishra Dhatu Nigam Ltd., Hyderabad
- Zircaloy Fabrication Project, Hyderabad
- Seamless Steel Tube Plant, Hyderabad
- Scooter Factory at Fatwa (Bihar) & Lucknow (UP) Scooters India Ltd.
- Hindustan Fertilizer Corpn. Ltd. / Durgapur
- Telephone Instruments Factory, RaeBareli / ITI
- Artificial Limbs Manufacturing Plant Factory, Kanpur
- Benzol Recovery and Rectification Plant (Turnkey) at Bokaro / BSL.
- Triveni Structurals Ltd. / Naini (Allahabad)
- IISCO Stanton Pipe Factory / Ujjain
- Cold Storage for J & K Industries Corpn. New Delhi.
- Refinery Pipeline & Underground Reservoir works / IOCL Haldia
- LPG Bottling Plant at Uluberia, Pithampur & Raigunj / BPCL
- Godowns for Karnataka State Warehousing Corporation
- Govt. of India Mint at Mumbai & Hyderabad / RBI
- Public Health works at Bawal (Haryana) / HSIDC Ltd. Haryana
- IIPC Project at Mazhumannur, Ernakulam / KIDC, Kerala
- Indian Council of Medical Research, Mumbai
- Sub-station for major project “Mumbai” Refinery/HPCL
- Construction of Disaster Recovery Data Centre at Hyderabad/HPCL
|
|
SILOS
|
- Construction of Food Grains Silos at Naraina/ FCI Delhi
- Construction of Silos at Kudremukh / Kudremukh Iron Ore Company Ltd.
- Construction of Food Grain Silos at Patna and Bikramgang (Turnkey work) / Bihar State Food and Civil Supplies Corporation Ltd. Patna.
|
|
Power Plants
|
- Site Leveling Works at Singrauli STPP (UP), Kahaigaon STPP (Bihar),Korba STPP (MP)/NTPC and Anpara TPP/UPSEB.
- Ash Dyke & Ash Handling Plant Works at Thermal/Super Thermal Power Plants of NTPC at Unchahar (UP), Rihand (UP), Singrauii (UP).Farakka(WB), Korba(MP) and Anpara TPP/UPSEB.
- Circulating Water Pump House Works at Unchahar TPP(NTPC) and Tanda TPP (UPSEB).
- Structural Steelworks at Ramagundam STPP & Vindhyachal STPP (MP)/NTPC.
- General Civil Works at Singrauii STPP,Korba STPP, Farakka STPP,Vindhyachal STPP.
- Civil & Architectural Works at Neyveli Lignite Corpn. Ltd. (TamilNadu), Karbighaiya TPP/Bihar(BSEB)
- Captive Power Plant Works at Bokaro Steel Plant, Kathara (Bihar)/BHEL and Talcher, NALCO
- Plant and Township (Including Infrastructural Works) and Ash Water Recirculation System at Kahalgaon STPP (Bihar)/NTPC,
- i) Coal. Ash & Fuel, Oil Handling System at Rihand STPP/NTPC. ii) Coal Handling Plant at Korba STPP (NTPC), Faridabad TPP, (Haryana SEB), Panki TPP (UPSEB).
- Erection of Boilers
- 1x210 MW at Bhusawal (MSEB)
- 3x210 MW at Obra (UPSBB)
- 1x 60 MW at Talcher (FCl)
- Make up Water System (Turnkey Works) at Simadhri TPP(AP)/NTPC.
- Main Plant Civil works at Kahalgaon.
- Steam Generation Area Civil & Structural works at Kahalgaon, Talcher, Sipat
|
|
|
Chimneys
|
- 01x160M Wanakbori chimney for GSEB / Gujarat
- 01x180M high chimney for Bokaro Steel Plant
- 03x220M high chimney for Korba STPP (NTPC)
- 02x220M high chimney for Vindhyachal STPP (NTPC)
- 01x220M high chimney for UPSEB, Anpara
- 01x275M high chimney for Farakka STPP (NTPC)
- 01x275M high chimney for Chandrapur TPP (MSEB)
- 01x100M high chimney at Haldia for IOCL
|
|
Dams, Dykes and Barrages
|
- DAMS
- Concrete Gravity Dam at Supa (350 M Length & 101M Height) for Karnataka Power Corporation Ltd.
- Earthen Dam at Barsua Iron Ore Mines for Rourkela Steel Plant.
- Boridih Dam (150 M Length & 31M Height) for Bhilai Steel Plant.
- Two Tailing Dams for Bhilai Steel Plant at Hitkasa (375 Length & 7 M Height, 70 M Length & 7 M Height)
- Earthen Dam at Bhawanathpur at the Tri-junction of Bihar, UP and MP for Bokaro Steel Plant
- Masonry Dam at Chappi for Rajasthan State Irrigation Deptt., Jhalawar
- DYKES & CANALS
- Construction of Right Dykes of Icha Dam for Subernarekha Multi Purpose Project, Govt. of Bihar,
- Earth Work and Bed Lining for Icha Right Main Canal for Subernarekha Multi Purpose Project, Govt, of Bihar.
- POWER HOUSES
- Valmikinagar Power House for Eastern Gandak Canal Hydro Electric Project / Bihar State Hydro Electric Power Corporation Ltd.
- Nagjhari Surface Power House for Karnataka Power Corpora-tion Ltd., Karnataka.
- BARRAGES & OTHER STRUCTURES
- Tanakpur Barrage and Head Regulator in Nainital(UP) for National Hydro-electric Power Corporation Ltd. (NHPC)
- Tail Race Channel in North Koel Hydro-electric Project in Palamau District, Bihar for Bihar Hydro-electric Power Corporation Ltd. (BHPC)
- Intake Structures, Block out for Penstock in the body of the Dam etc. for North Koel Hydro-electric Project at Mandal for BHPC.
- North Koel Barrage at Mohammedganj for Water Resources Deptt., Govt. of Bihar.
- Fabrication, Transportation and Erection of Steel Penstocks and Bends for Rammam Hydro-electric Project, Stage-II Darjeeling for WBSEB.
- Chitravati Balancing Reservoir for Irrigation Deptt., Govt. of A.P
- Construction of Northern Side and Southern Side Diversion Channel and Storm Water Drain at Rourkela Steel Plant, Rourkela.
|
|
DRY DOCKS / JETTIES
|
- Construction of Dry Dock at Kolkata / Garden Reach Ship Builders Engineers Ltd., Kolkata.
- Intake Jetty on the Riverbed of Hooghly at Geonkhali under Haldia Water Supply Project.
- Construction of RCC Dolphin No-6 and Conversion of Existing Dolphins into Repair Jetty at Dry Dock - Hindustan Shipyard Ltd., Kolkata.
|
|
MINING COMPLEXES
|
- Construction of Bailadila Iron ore Project at Deposit No.5 & 11C / NMDC, Hyderabad.
- Construction of Ore Dressing Plant at Donimalai Iron ore Project / NMDC, Hyderabad.
- Dalli Rajhara Mines / SAIL, Bhilai Steel Plant.
- Construction of Plant works at Kudremukh / Kudremukh Iron Ore Project.
- Construction works of Bhawanathpur Mines & Ore Processing and Ore Handling Plant for Meghahatuburu Iron Ore Project / SAIL, Bokaro Steel Plant
- Augmentation of Bolani Iron Ore Mines (Turnkey Works) for Modernisation of Durgapur Steel Plant, SAIL
|
|
TOWNSHIPS AND BUILDINGS
|
PUBLIC HOUSING / TOWNSHIP COMPLEXES
|
|
SLNO |
NAME |
CLIENT |
|
1 |
BOKARO STEEL PLANT(10019
Nos) |
SAIL/bsp |
|
2 |
BHAWANATHPUR LIMESTONE MINES
(521 NOS) |
SAIL/BSP |
|
3 |
SALEM STEEL PLANT (322
NOS) |
SAiL/SSP |
|
4 |
KORBA ALUMINIUM PLANT
(654 NOS) |
BALCO/KORBA |
|
5 |
HARDWAR TRANSFORMER
PROJECT(31NOS) |
BHEL |
|
6 |
MALANJKHAND COPPER
PROJECT(134 NOS) |
HCL |
|
7 |
VISAKHAPATNAM
(302 NOS) |
RINL / VIZAG |
|
8 |
KUDREMUKH IRON ORE
PLANT (982 NOS) |
KIOCL |
|
9 |
PAONTA CEMENT PLANT
(102 NOS) |
CCI |
|
10 |
BHULI & MOONIDIH
QUARTERS |
BCCL / DHANBAD |
|
11 |
SCIENTISTS
APARTMENTS AT JADAVPUR, KOLKATA
|
CENTRAL GLASS & CERAMIC
RESEARCH INSTITUTE, KOLKATA
|
|
12 |
4 STOREYED
BUILDING FOR NEW INDIRA GANDHI MINT PROJECT
|
RBI/HYDERABAD |
|
13 |
BUILDING
WORKS OF 4 STOREYED FOR NEW NOTE PRESS PROJECT , MYSORE
|
RBI/MYSORE |
|
14 |
BULK ANALYSIS
LABORATORY ADMINISTRATION WORKSHOP, SUB-STATION ETC.
|
BARC/HYDERABAD |
|
15 |
HOUSING COMPLEX, SCHOOL
BUILDINGS ATHYDERABAD |
NUCLEAR FUEL COMPLEX,HYDERABAD
|
|
16 |
REGIONAL
WORKSHOP COMPLEX AT BIJOURI IN HASDEO (4
STOREYED)
|
SECL / BILASPUR |
|
17 |
PRE-WASHERY,
WASHERY, POST-WASHERY, MANAGEMENT
BUILDING
|
CCL, RANCHI |
|
18 |
NEW
ADMINISTRATIVE BUILDING AT BILASPUR
|
SECL, BILASPUR |
|
19 |
MULTI-STORIED
COMMERCIAL CUM OFFICE COMPLEX AT FISH MARKET
|
BHUBANESHWAR DEVELOPMENT
AUTHORITY, BHUBANESHWAR
|
|
20 |
240 NOS QRS,
TOWER BLOCKS, AMENITY BLOCK, COMPUND WALL, DEVELOPMENT WORKS & OTHERS MISC.
WORKS
|
TAMIL NADU HOUSING BOARD,
CHENNAI
|
|
21 |
OFFICE
BUILDING OF BIDHANNAGAR MUNICIPALITY AT FD-BLOCK, SECTOR-III, SALTLAKE
|
BIDHANNAGAR MUNICIPALITY, KOLKATA
|
|
22 |
RESIDENTIAL ACCOMODATION FOR
BSF AT SALTLAKE, KOLKATA
|
CPWD/KOLKATA |
|
23 |
CONSTRUCTION OF GODOWNS AT
BANNUR, SINDHANUR, GULBARGA, MANVI, HASAN, KARALUR
|
KARNATAKA STATE WARE
HOUSING, CORPN, BANGALORE
|
|
24 |
HOUSEs INCLUDING
INFRASTRUCTURAL FACILITIES AT HALDIA
|
HALDIA DEVELOPMENT
AUTHORITY, HALDIA
|
|
25 |
DEVELOPMENT OF INDUSTRIAL
PARK AT DURGAPUR |
ASANSOL AND DURGAPUR
DEVELOPMENT AUTHORITY, DURGAPUR
|
|
26 |
RESIDENTIAL
COMPLEX AT RAJAPUR |
WEST-BENGAL HOUSING
BOARD, KOLKATA |
|
27 |
BUILDING
WORKS AT IIDC PROJECT MAZHUVANNUR, ERNAKULAM
|
KERALA INDUSTRIAL
INFRASTRUCTURAL DEV.CORPN., KERALA
|
|
28 |
35 NOS. ‘B’
TYPE RESIDENTIAL
BUILDINGS AT BACHAR FOR ASHOKE PROJECT AT PIPARWAR
|
CENTRAL COALFIELDS LTD. RANCHI
|
|
29 |
MLA FLATS,
PATNA |
GOVT.
OF BIHAR |
|
30 |
EKTA BHAWAN AND
INDOOR STADIUM, PATNA |
GOVT.OF
BIHAR |
|
31 |
900
UNITS OF QUARTERS AT KAHALGAON
|
NTPC, KAHALGAON |
|
32 |
RESIDENTIAL BUILDINGS AT
KEDLA COAL WASHERY PROJECT, HAZARIBAGH
|
cCL,
rANCHI |
|
33 |
176 NOS.
‘A’ TYPE QUARTERS AT MOUBHANDAR, GHATSILA
|
HINDUSTAN COPPER LTD. |
|
34 |
CISF
COMPLEX AND MINERS ‘
QUARTERS AT DHANBAD |
BCCL |
|
35 |
SWIMMING POOL
AT TRIVANDRUM |
KERALA SPORTS
COUNCIL, TRIVaNDRUM |
|
36 |
Main Block of Kerala Police Academy/
TrivaNdrum & Staff Qtrs./Trichur
|
Kerala
Police Housing and
Constrnction
Corporation Limited,
Trivandrum |
|
37 |
STAFF QUATERS
AT BAHADURPUR (PATNA) |
RBI / PATNA |
|
38 |
BUILDINGS FOR POLICE ACADEMY |
BIHAR POLICE ACADEMY, PATNA |
|
39 |
Various
Housing Works at K D
Hesalo Ng / PiparwaR |
CCL / RANCHI |
|
40 |
ICMR WORKS AT AMBATTUR AND CHENNAI |
NATIONAL INSTITUTE OF EPEDERMIOLOGY,
CHENNAI |
|
41 |
TERMINAL BUILDING AT PATHANKOT
|
AAI-NEW DELHI |
|
42 |
PLAY-FIELDS AND STADIUM AT HYDERABAD |
MUNICIPAL CORP. OF HYDERABAD |
|
43 |
A DOUR. Engine Testing Building at
Ambala & GorakhpUr
|
HAL / BANGLORE |
|
44 |
Township Works (Phase-I & Phase-II) at Simadhri Thermal Power Station |
NTPC / SIMADHRI STPP |
|
45 |
COMMERCIAL A COMPLEX AT ARYA KUMAR ROAD, PATNA |
PATNA MUNICIPAL CORPORATION |
|
46 |
MARRIED ACCOMMODLATION FOR 40 MAJORS & 100 ORS AT SECUNDERABAD |
SECUNDERABAD |
|
47 |
NETAJI SLUBHAS ENCLAVE AT GADAKHANA, CHANDRASEKHARPUR, BHUBANESWAR |
BHUBANESWAR DEVELOPMENT AUTHORITY |
|
48 |
PILGRIMAGE CUM CULTURAL CENTRE (PHASE-I) AT SOLOPHOK, NAMCHI, SOUTH SIKKIM |
RURAL MANAGEMENT DEVELOPMENT DEPT, GANGTOK |
|
49 |
BUS TERMINAL & MULTIPURPOSE COMPLEX AT KARUNAMOYEE |
BIDHAN NAGAR MUNICIPALITY, KOLKATA |
|
|
MEDICAL INSTITUTIONS
|
|
1 |
PATLIPUTRA
MEDICAL COLLEGE, DHANBAD |
GOVT. OF JHARKHAND |
|
2 |
INDIRA GANDHI
INSTITUTE OF MEDICAL SCIENCES,PATNA |
GOVT. OF
BIHAR |
|
3 |
HOSPITAL AT
VARANASI |
BHU /
VARANASI |
|
4 |
EXTENSION &
RENOVATION OF
DISTRICT HOSPITAL AT TANDUR, MALAKPET
|
A.P. HEALTH & MEDICAL
HOUSING & INFRASTRUCTURE DEVELOPMENT CORPN. LTD. HYDERABAD
|
|
5 |
ADMINISTRATION BUILDING, HOSTEL BLOCK AND RESIDENTIAL COMPLEX AT PATNA
|
STATE INSTITUTE OF HEALTH AND FAMILY WELFARE, GOVT. OF
BIHAR |
|
6 |
HOSPITAL BUILDING OF BHILAI
STEEL PLANT |
SAIL, BHILAI STEEL PLANT,
BHILAI |
|
|
EDUCATIONAL INSTITUTIONS
|
|
1 |
SHIKSHA BHAWAN, PATNA |
GOVT. OF
BIHAR |
|
2 |
JAWAHAR NAVODAYA VIDYALAYAS AT
DIFFERENT DISTRICTS OF
ANDHRA PRADESH, HARYANA, BIHAR,
JHARKHAND AND KARNATAKA |
NAVODAYA VIDALAYA SAMITHY,
(MINISTRY OF HUMAN RESOURCE DEVELOPMENT, GOVT. OF INDIA) |
|
3 |
KENDRIYA
VIDYALAYAS (SCHOOL AND STAFF QUARTERS) AT BAMANGACHI, BAHARAMPUR, RAIGANJ, BURDWAN(WB), ANANTAPUR AND OTHER DISTRICTS(AP), TUMKUR,
BIDHAR, MG RAILWAY COLONY, HEBBAL, YELAHANKA (ALL IN KARNATAKA) TAMBARAM -
I & II, ISLAND GROUND, TIRUPATI, MEENAMBAKAM (TAMIL NADU),
BHUBANESWAR (ORISSA), ROHINI (DELHI) AND DELHI CANTONMENT. |
KENDRIYA
VIDYALAYA SANGATHAN (MINISTRY OF HUMAN RESOURCE DEVELOPMENT, GOVT.
OF INDIA) |
|
4 |
BIHAR
INTERMEDIATE EDUCATIONAL COUNCIL BUILDING AT PATNA |
BIHAR
INTERMEDIATE EDUCATION COUNCIL, PATNA. |
|
5 |
RESIDENTIAL COMPLEX AT JAMSHEDPUR |
REGIONAL INSTITUTE OF
TECHNOLOGY, JAMSHEDPUR |
|
6 |
SCHOOL BUILDING KITCHEN & DINING, DORMITORY AT JNV, MYSORE |
NAVODAYA VIDYALAYA SAMITI, NEW DELHI |
|
7 |
GOVT. POLYTECHNIC BUILDING & NEW GOVT.FIRST GRADE COLLEGE BUILDINGS UNDER HUDCO LOAN SCHEME |
SARVA SIKSHA ABHIYAN SAMITI |
|
8 |
BUILDING FOR MAHARAJA RANJIT SINGH PANORAMA AT AMRITSAR |
NATIONAL COUNCIL OF SCIENCE MUSEUM |
|
OVERSEAS |
|
9 |
68 SCHOOL
BUILDINGS AT WESTERN SECTOR AND 37 SCHOOL BUILDINGS AT EASTERN SECTOR |
SCHOOL BUILDING
ADMINISTRATION SOCIALIST PEOPLE'S LIBYAN, ARAB JAMAHIRIYA,
LIBYA |
|
10 |
MAIN TRAINING
CENTRE AND QUORANIC SCHOOL BUILDINGS AT TRIPOLI |
-DO- |
|
|
ROADS AND EXPRESSWAYS
|
| |
HSCL CONSTRUCTS ROADS, HIGHWAYS, FLYOVERS CONFORMINGTO INTERNATIONAL STANDARDS, AS ALSO UNDERTAKES STRENGTHENING AND WIDENING OF ROADS - ALL USING SOPHISTICATED EQUIPMENT.
|
|
|
|
PROJECTS EXECUTED
|
|
|
|
NAME
|
CLIENTS
|
|
|
|
|
|
1 |
CONSTRUCTION OF RURAL ROADS INCLUDING BRIDGES
IN
|
|
|
|
(A) NOAMUNDI BLOCK
|
BIHAR PLATEAU DEVELOPMENT PROJECT, RANCHI
|
|
|
(B) TATANAGAR BLOCK,
WEST SINGHBHUM DISTRICT
|
-DO-
|
|
|
(C) CHAKRADHARPUR BLOCK
|
-DO-
|
|
|
(D) JHIMPANI BLOCK
|
-DO-
|
|
|
(E) TORPA BLOCK (RANCHI DISTRICT)
|
-DO-
|
|
|
(F) RANIA BLOCK
|
-DO-
|
|
|
|
|
|
|
(WORLD BANK AIDED PROJECT)
|
|
|
|
|
|
|
2 |
CONSTRUCTION OF WBM HAUL ROADS,
SIDE DRAIN & CULVERTSAT KHEDIA, SINGRAULI
|
NORTHERN COALFIELDS
LTD.,
SINGRAULI
|
|
3 |
CONSTRUCTION OF WBM ROAD, VARIOUS SIZES OF
SURFACE DRAIN,
RESERVOIR, RCC CULVERT AT LPG BOTTLING PLANT/GIDHA
|
INDIAN OIL CORPN LTD. PATNA
|
|
4 |
ROAD ASPHALTING AT LPG BOTTLING
PLANT/GIDHA
|
INDIAN OIL CORPN LTD. PATNA
|
|
5 |
PREMIX CARPETTING
OF PLANT &
TOWNSHIP
AND
APPROACH ROAD AT
KAHALGAON
|
NTPC/KAHALGAON
|
|
6 |
REPAIRS AND MAINTENANCE OF
ROADS AS WELL AS WIDENING, FORMATION ETC. INCLUDING CONNECTING ROADS TO
MAIN ROADS AND HIGH WAYS |
SAIL, BOKARO STEEL PLANT
BOKARO |
|
7 |
REPAIR OF ROAD NH-34 FROM
42 KM TO 48 KM IN NORTH 24 PGS. |
PWD (ROADS), GOVT. OF WEST
BENGAL |
|
|
PROJECTS UNDER
EXECUTION
|
|
|
1 |
CONSTRUCTION WORKS FOR
IMPROVEMENT
OF MANGALDAI, PATHARIGHAT,
KHOIRABARI
ROAD INCLUDING
CULVERTS &CONVERSION
OF
TIMBER BRIDGES INTO CONCRETE
BRIDGESIN DARRANG
DISTRICT.
|
PWD (ROADS) GOVT. OF ASSAM
|
|
2 |
CONSTRUCTION OF BHOPAL-SEHORE
BYE
PASS
INCLUDING WIDENING / STRENGTHENING
OF
EXISTING ROADS & CONSTRUCTION
OF
RAILWAY OVER
BRIDGE.
|
PWD/GOVT. OF M.P./BHOPAL
|
|
3 |
ROAD OVER BRIDGE AT KOCHI, TRIPURITHURA,
PULLEPPADDY, PONNURUNNI.
|
ROADS & BRIDGES DEV. CORPN.
KERALA
|
|
4 |
CONSTRUCTION OF NEW ROADS &
WIDENING & STRENGTHENING OF EXISTING
ROADS.
|
VISAKHAPATNAM
PORT TRUST VIZAG
|
|
|
ROADS
|
|
|
NAME
|
CLIENTS
|
|
1 |
WIDENING OF SOUTHERN SECTION OF EASTERN METROPOLITAN BYE-PASS FROM RB ROTARY TO THE GATE OF PEERLESS HOSPITAL
|
CALCUTTA METROPOLITAN DEVELOPMENT AUTHORITY, UNNAYAN BHAWAN, BIDHAN NAGAR, KOLKATA
|
|
2 |
ROAD WORKS IN VISAKHAPATNAM STEEL PLANT
|
RINL VIZAG STEEL PLANT, VIZAG
|
|
3 |
STRENGTHENING OF ROAD WORKS IN VISAKHAPATNAM PORT TRUST
|
VISAKHAPATNAM PORT TRUST VISAKHAPATNAM
|
|
4 |
CONSTRUCTION OF ROAD WORKS IN COKE OVEN AREA OF KMCL
|
KONARK METCOKE LTD. DUBURI
|
|
5 |
CONSTRUCTION & DEVELOPMENT OF PLANT ROADS BOTH IN CUTTING & EMBANKMENT FORMATION AND OTHER ASSOCIATED CIVIL WORKS
|
NINL DUBURI
|
|
6 |
CONSTRUCTION OF BHOPAL-SEHORE BYE PASS ROAD INCL. WIDLENING, STRENGTHENING OF EXISTING ROAD AND CONSTRUCTION OF ROB ETC.
|
MP PWD DEPTT BHOPAL
|
|
7 |
ENHANCED PERIODICAL MAINTENANCE OF GOVT ROADS IN TUTICORIN DIST
|
TAMIL NADU ROAD SECTOR PROJECT, CHENNAI
|
|
8 |
ENHANCED PERIODICAL MAINTENANCE OF GOVT. ROADS IN SALEM & KARUR DISTRICTS
|
TAMIL NADU ROAD SECTOR PROJECT, CHENNAI
|
|
9 |
WIDENING & STRENGTHENING OF BALINGA TO TAPARIA ROAD
|
MAHANADI COALFIELDS LTD. SAMBALPUR
|
|
10 |
FOUR LANING FROM KM 94.0 TO KM 123.0 OF NAGPUR-HYDERABAD SECTION OF NH-7 IN MAHARASHTRA
|
NHAI NEW DELHI
|
|
|
OTHER WORKS
|
- Chitravati Balancing Reservoir for Irrigation Deptt., Govt. of A.P.
- Construction of Impounding Reservoir and deepening of the Bed & Re-sectioning of bund for Linga Water Supply Scheme for Karnataka Water Supply & Sewerage Board.
- Spillway Bridge at Durgawati (Sasaram) for Water Resources Department, Govt. of Bihar.
- Land Development Work for about 353 Ha (in groups) in Action Area-III under New Town Project, Kolkata, HIDCO
|
|
Bridges
|
- Pre-stressed Concrete Bridge across the River Subarnrekha at
Ghatsila (RCC open foundation with Piers and Composite Super
Structure consisting of Pre-stressed Concrete Girders with RCC
Decking - length 350 M consisting of 2 spans and the length of
each span is 28.787 M. and an intermediate span of 29.2 M) for
Hindustan Copper Limited.
- Bridge over Marshalling Yard in Durgapur Steel Plant
- High level Pre-stressed bridge across River Damodar at Telmachu
catering to double lane traffic with foot-path on either side (overall)
length of the bridge is 392.22 M from abutment to abutment) for
National Highway Circle, Dhanbad, Bihar.
- Approach and Interchange structures for Second Hooghly Bridge
consisting of Solid slabs, RCC Deck slabs and Pre-stressed concrete
Girders supported on Pile foundation for Approach Viaduct in Kolkata
And Howrah side for Kolkata/Howrah Improvement Trust.
- Approach Roads, Guide Bundh and Sealing of Spill Channel of River
Bagmati for a High Level bridge across River Kosi near Dumrighat.
- Construction of Approach road to the Bridge on River Gandak
(Sonepur-Hazipur Side Approach)
- Design and Construction of 6 Bridges on Turnkey basis in Madurai,
Theni and Dindigul Districts of Tamil Nadu for Highways & Rural
Works Department, Govt. of Tamilnadu.
- Turnkey work for Design & Construction of Bridges in Salem,
Dharmapuri & Namakkal Districts of Tamilnadu for Highways &
Rural Works Department, Govt. of Tamilnadu.
- Construction of Concrete Bridges & Culverts including Roads
etc. in Darrang Dist. Assam for PWD (Roads), Chandmari, Guwahati Assam.
- Reconstruction of Bridge at Vaigai River at KM 0/4 of
Edalkatur Approach Road, Madurai, Tamilnadu for Highways
& Rural Works Department, Govt. of Tamilnadu
- Construction of Fly Over with clover leaves at MP Road
No. 3 and Express Highway and allied works near Amity
School for New Okhla Industrial Development Authority,
Sector-6, Noida, Dist Gautam Budh Nagar, UP.
- Construction of Flyover & allied works at T-junction near
Filrm City in Distri. Gautam Budh Nagar, UP for New Okhla
Industrial Development Authority, Sector-6, Noida,
Dist Gautam Budh Nagar, UP.
- Construction of Rural Roads, Bridges & Culverts at
Simdega, Jharkhand for Rural Development Department,Govt. of Jharkhand.
- Construction of submersible bridges at Bokaro for Rural
Development Department, Special Division, Govt. of Jharkhand
|
|
METRO RAIL
|
- Construction of Basement/Subways Structures at Netaji Bhawan
Jatindas Park and Kalighat Stations/Metro Railway Project,Kolkata
|
|
RAILWAYS
|
| |
HSCL HAS TAKEN UP WORKS OF CONSTRUCTION OF BRIDGES,
EMBANKMENT OF BRIDGES AND ALSO CONSTRUCTION OF RCC
BOX CULVERTS FOR THE RAILWAYS AND ARE PRESENTLY
EXECUTING THE FOLLOWING WORKS
|
|
|
1 |
CONSTRUCTION OF 23 NOS.
OF RCC BOX CULVERTS ON TAMLUK-DIGHA NEW RAILWAY
PROJECT (0.00 K.M. TO 45.00
K.M.S)
|
SOUTH EASTERN RAILWAY
KOLKATA |
|
2 |
RESIDUAL WORK FOR EARTH
WORK IN FILLING, BLANKETING, CONSTRUCTION OF MINOR AND MAJOR BRIDGES WITH STEEL
COMPOSITE GIRDER AND BRIDGE NO 22, RCC BOX BETWEEN
PARSA BAZAR & PUN PUN IN CONNECTION WITH PATNA-GAYA
DOUBLING (PH-II)
|
EASTERN RAILWAY KOLKATA |
|
3 |
EARTHWORK IN EMBANKMENT IN SOUTH EMBANKMENT (PATNA END), BLANKETTING,
CONSTRUCTION OF MINOR BRIDGES ACROSS RIVER GANGA CONNECTING RAILWAY
LINES BETWEEN PATNA AND SONEPUR STATION. |
EASTERN RAILWAY KOLKATA |
|
4 |
CONSTRUCTION OF BG WASHING LINE NO.6, ROAD ALONG THE WASHING LINE AND ON APPROACHES & OTHER MISCELLANEOUS WORKS IN CONNECTION WITH ADDITION AND ALTERATION IN COACHING YARD AT HAZRAT-NIZAMUDDIN STATION OF DELHI DIVISION |
NORTHERN RAILWAY DELHI |
|
5 |
EARTHWORK IN FILLING IN FORMATION, EXTENSION OF MINOR BRIDGES, CONSTRUCTION OF HIGH LEVEL PLATFORM ETC. FOR CONVERSION OF JATTDUMARI HALT INTO A JUNCTION IN CONNECTION WITH NEW BG LINE FROM NEORA TO DANAIAWAN |
EAST CENTRAL RAILWAY PATNA |
|
6 |
CONSTRUCTION OF SUB STRUCTURE OF MAJOR BRIDGES ROBS AND RUBS IN CONNECTION WITH CONSTRUCTION OF NEW BG LINE BETWEEN DANAIAWAN BIHAR SHARIF-BIRBIGHA-SHEIKHPURA & NATESAE-ISLAMPUR |
EAST CENTRAL RAILWAY PATNA |
|
7 |
EARTHWORK IN FILLING FOR EMBANKMENT WITH CONTRACTORS OWN EARTH & CUTTING TO REQUIRED PROFILE INCLUDING COMPACTION BETWEEN GARHMUKTESARPUL & KUCHESAR ROAD STATION IN CONNECTION WITH HAPUR-KANKATHUR DOUBLING (ZONE-C) |
NORTHERN RAILWAY DELHI |
|
8 |
CONSTRUCTION OF SUB-STRUCTURE CONSISTING OF PILE/OPEN FOUNDATION, PIERS, ABUTMENTS AND OTHER ANCILLARY WORKS FOR 2ND RAILWAY BRIDGE FOR RVNL'S RAILWAY DOUBLING PROJECT IN RAJATORGARH-BARANG SECTION OF EAST COAST RAILWAY |
IRCON INTERNATIONAL LTD. NEW DELHI |
|
9 |
PROPOSED NEW COVER SHED OF SIZE 36.6 M X 130 M WITH 2 X 10 MT AND 2 X 25 MT EOT CRANE TO POH EMU/DMO COACHES & CONSTRUCTION OF ADMINISTRATIVE BUILDING IN LALLALGUDA WAGON WORKSHOP |
SOUTH CENTRAL RAILWAY SECUNDERABAD |
|
10 |
CONSTRUCTION/RE-BUILDING/RE-GIRDERING AND SLAB LAUNCHING/EXTENSION OF EXISTING/NEW MINOR BRIDGES NO. 5 TO 8, 9A, 10, 10A IN CONNECTION WITH GAUGE CONVERSION WORK OF SAMASTIPUR-KHAGARIA SECTION |
EAST CENTRAL RAILWAY PATNA |
|
11 |
CONSTRUCTION OF SUPER STRUCTURE OF GM'S MAIN ADMINISTRATIVE BUILDING AT HAJIPUR |
EAST CENTRAL RAILWAY PATNA |
|
12 |
DKB RAIL LINK PROJECT - EXECUTION OF EARTHWORK, MINOR BRIDGES AND OTHER ALLIED WORKS BETWEEN KM 2.00 & KM 5.93 OF NEW FLY OVER ALIGNMENT |
EAST COAST RAILWAY |
|
13 |
INFRASTRUCTURE FACILITIES FOR SETTING UP OF SOUTH WESTERN RAILWAY ZONE AT HUBLI |
SOUTH WESTERN RAILWAY BANGALORE |
|
|
AIRPORTS
|
| |
HSCL UNDERTAKES CONSTRUCTION OF AIRPORT BUILDING INCLUDING
HANGARS, RUN-UP BAYS, APRONS ETC. AND HAS COMPLETED THE FOLLOWING WORKS
|
|
|
1 |
FABRICATION & ERECTION OF
GALVANISED STEEL STRUCTURES
FOR AIRPORT HANGARS AT
MALE, MALDIVES
|
AIRPORTS AUTHORITY OF INDIA, NEW DELHI |
|
2 |
CONSTRUCTION OF RUN-UP BAYS & APRONS AT ENGG. BASE,
HYDERABAD
|
AIRPORTS AUTHORITY OF INDIA, NEW DELHI |
|
3 |
CONSTRUCTION OF ENGG. BUILDINGS, APRONS ETC. AT
KOLKATA AIRPORT
|
AIRPORTS AUTHORITY OF INDIA, NEW DELHI |
|
4 |
CONSTRUCTION OF TECHNICAL BUILDING AT MADRAS
AIRPORT
|
AIRPORTS AUTHORITY OF INDIA, NEW DELHI |
|
5 |
CONSTRUCTION OF
INTERNATIONAL AIRPORT TERMINAL BUILDING AND CONTROL TOWER AT
NEDUMBASERRY AIRPORT (COCHIN) |
COCHIN AIRPORT DEVELOPMENT
AUTHORITY, COCHIN |
|
|
|
|
 |
| Cement Plant at Paonta Sahib Himachal Pradesh |

|
| Silos at Bokaro |
|

|
| View of Boiler, Unit 4 and LHS Mill Bunker at Talcher STPP (Orissa) |
| 
|
| Eretion of Boiler in a Power Plant at Obra STPP(UP) |
|

|
| 275 M High chimney constructed for NTPC Farakka STPP |
|
1 |
| Concrete Gravity Dam at Supa, Karnataka. |
| 
|
| Chappi Dam at Jhalawar, Rajasthan |
|

|
| View of the Batching Plant at Tanakpur Barrage Project |
|

|
| Dry Dock Constructed for Garden Reach Ship Builders and Engineers, Kolkata. |
|

|
| Iron Ore Processing Plant, Bolani |
|

|
| Administrative building of Hindustan Copper Limiter, Calcutta |
|

|
| Administrative building of Hindustan Cables Hyderabad |
|

|
| Talkatora Indoor Stadium, New Delhi |
|

|
| National Productivity Council Building, New Delhi |
|

|
| MLA Qrs. at Chennai, Tamil Nadu |
|

|
| Jawaharlal Nehru International Stadium, Cochin |
|

|
| Pourabhawan for Bidhannagar Municipality, Saltlake, Kolkata |
|

|
| Hospital Building of Bhilai Steel Plant |
|

|
| Panoromic view of A1 type Permanent School Building of Kendriya Vidyalaya at S.K. University Campus, Ananthpur (A.P.) |
|

|
| Bihar Intermediate Education Council Building, at Budh Marg, Patna |
|

|
| Flyover of Vidyasagar Setu, Calcutta |
|

|
| Reconstruction of bridge at Km 66/6 of Periakulam - Kumuli Road (Theni District)Tamil Nadu |
|

|
| Bridge accross the Vaigai River, Tamil Nadu |
|

|
| Subarnarekha Bridge, Ghatshila, West Bengal |
|

|
| Air Traffic Service Building of Chennai Airport |
 |
| A view of International Terminal Building, International Airport, Cochin |
|