HINDUSTAN STEELWORKS CONSTRUCTION LIMITED

Inside View of Blast Furnace at Bhadravati Steel Plant.

Coke -oven Plant of Bokaro Steel Plant

Spirally Welded Pipe Plant, Rourkela Steel Plant

Vizag Steel Plant by night

 

About Us

Steel Plants

Multi-Dimensional Projects

Plant And Equipment

Turn Over

Management Table

Contact Us

At Bokaro

  • Construction work of 1.7 M. T/year stage

  • Expansion to 4 MT/year.

  • Benzol Recovery and Rectification Plant
    A Turnkey assignment to handle 180 tonnes of crude Benzol/day.

  • Specialised Equipment Erection of Allied Technological structures and other structural works in Cold Rolling Mill Complex.

  • CCP of Bokaro Steel Plant under Modernisation Package.

At Bhilai

  • Expansion from 2.5 MT/year to 4 MT/year including Setting up of Asia's largest Plate Mill and Continuous Casting Units as well as the most modern Blast Furnace No. 7 with Bell-less charging system replacing open hearth furnaces with twin hearth ones.

  • Wire Rod Mill at Bhilai Steel Plant for SAIL.

At Durgapur

  • Construction of Captive Power Plant Rebuilding of of Coke Oven Battery, Soaking Pits, Embankment Formation, New Tamla Bridge Control Room cabin in SMS, Capital Repair works of Blooming Mill & Billet Mill, New Sintering Plant, Global Packages of Rebuilding of Blast Furnaces, Construction of Raw Material Handling Complex and Revamping the original Sintering Plant.

  • Expansion works of Stage-II for Alloy Steel Plant.

  • Expansion work of Alloy Steel Plant, Durgapur Ore processing Plant at Bolani for SAIL Civil, Structural & Electrical works for Bloom Cluster Project, Re-heating Furnace and Structural Works of Ladle Furnace.

At Visakhapatnam

  • Site levelling, Civil, Structural and Equipment Erection work for Blast Furnace, Raw Material Handling System, Sintering Plant, Coke Oven and By-Product Plant, Steel Melting Shop and Township.

  • Structural Fabrication & Erection works of New Battery No. 4 at Visakhapatnam for RINL.

  • Technological assistance in Coke Oven Batteries Nos. 1, 2 & 3.

At Rourkela

  • Setting up of the Spirally Welded Pipe Plant Plant and Repair shops including Coke Oven Batteries.

  • Construction work of Plate Mill, Coke Oven Batteries and other Unit.

At Salem

  • Setting up of Cold Rolling Mill, Modification of Ventilation System, Civil Engineering Works of Basic Refractories Plant under Modernization and Expansion Programme. Civil & Structural works of the Hot Rolling Steckel Mill Complex.

At Burnpur

  • Structural and lining works of the Blast Furnace and Coke Oven Battery.

At Vijayanagar

  • Preliminary Site Survey & Soil Investigation works.

At Duburi

  • Blast Furnace Complex, Civil, Structural & Fabrication & Erection works.

  • Coke Oven Complex - Civil, Structural, Fabrication & Erection works.

  • Integrated Water Supply facilities at Duburi (Turnkey works for integrated Water Supply facilities for NINL).

At Bhadravati

  • Modernisation of Blast Furnace, Civil Works, Structural erection works etc.

Highlights

The following activities need a special mention.

  • More than 22 Nos. of Blast Furnaces have either been re-built or constructed new in various Steel Plants.

  • 15 Nos. of new and 19 Nos. of re-built Coke Oven Batteries have so far been executed successfully.

  • Rolling Mills, Raw Materials Handling Plants, Sinter Plants & other units of different designs and capacities have been constructed from site levelling stage to commissioning.

 

“The Nation Builders”
STEEL PLANTS